Solar Panel Installation Basics

 

broken image

 

The first step in solar panel installation is choosing a mounting structure. These frameworks have holes in them on the back for bolts and nuts. They can be fixed or moved to follow the sun. In either case, they perform the same functions as direct-mounted solar panels. Typically, you will install your solar panels outdoors, but they work just as well indoors, too. Many homeowners prefer ground-framework installations because they have an easier view of the sky.

 

Once you've decided to go solar, you'll need to hire a local solar panel installation company. They'll come to your home and fix the solar panels in place. Once you've selected the company to install your solar panel system, the installers will proceed with completing the paperwork. Most of the paperwork is done for you, so all you need to do is sign the contract and give them the green light to begin work. Get additional reading on benefits of solar panels.

 

Once the solar panels are mounted on the mounting structure, they will be secured with bolts or nuts. Some solar components use spring clamps to clamp the wire into place. You can find a tutorial on how to wire the SMA Sunny Boy and SolarEdge HD-Wave solar panel systems online. Enphase has an extensive hands-on video that shows you every step of the wiring process. If you decide to use a rail connector bracket, you should know the distance between each mounting hole on the back of the solar panel.

 

Once you've picked a mounting structure, you should fix the solar panels into the structure using bolts and nuts. You'll need to install a power meter, which may add two or three hours to the installation process. After that, your solar panel installation will be complete! You'll have an array of energy-producing devices on your roof. You'll need to get ready to enjoy all of the benefits that solar energy can bring.

 

Depending on the estimate size and complexity of the system, solar panel installation may take a few days, a few weeks, or even months. The installation process can be completed in one or two days, and can also be completed in parallel. A parallel connection connects the Positive (+) wire of one PV module to the Negative (-) Wire of another PV module. This will increase the voltage to match the battery bank. However, if you're not installing a parallel connection, the electrical panels will need to be connected to the battery.

 

After the solar panel installation process is completed, you'll need to connect the panels to the grid. Your electric company should be able to connect your system to the grid. If you have an existing electrical panel system, the installation will require a power meter. Your utility company will also be in charge of the permitting process. While this may seem daunting, it's worth the trouble! A solar panel installation will help you cut your electricity costs and provide clean electricity, but be sure to check your local laws.

 Check out this post for more details related to this article: https://en.wikipedia.org/wiki/Solar_panel.